Questions from General Operations Management


Q: Match the following characteristics with their relevant project team organizational structures.

Match the following characteristics with their relevant project team organizational structures.

See Answer

Q: The following tasks are to be performed on an assembly line.

The following tasks are to be performed on an assembly line. The workday is seven hours long. The demand for the completed product is 750 per day. (Answers in Appendix D) a. Find the cycle time requ...

See Answer

Q: Design specifications require that a key dimension on a product measure 100

Design specifications require that a key dimension on a product measure 100 ± 10 units. A process being considered for producing this product has a standard deviation of four units. a. What can you sa...

See Answer

Q: In the past, Alpha Corporation has not performed incoming quality control

In the past, Alpha Corporation has not performed incoming quality control inspections but has taken the word of its vendors. However, Alpha has been having some unsatisfactory experience recently wi...

See Answer

Q: Large-scale integrated (LSI) circuit chips are made in

Large-scale integrated (LSI) circuit chips are made in one department of an electronics firm. These chips are incorporated into analog devices that are then encased in epoxy. The yield is not particul...

See Answer

Q: C-Spec, Inc., is attempting to determine whether an

C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± .003 inches. After a trial run on this machine, C-Spec has...

See Answer

Q: Quality Parts Company supplies gizmos for a computer manufacturer located a few

Quality Parts Company supplies gizmos for a computer manufacturer located a few miles away. The company produces two different models of gizmos in production runs ranging from 100 to 300 units. The pr...

See Answer

Q: Stopping waste is a vital part of lean. Identify some sources

Stopping waste is a vital part of lean. Identify some sources of waste in your home or dorm and discuss how they may be eliminated.

See Answer

Q: One way to help achieve lean production systems is to employ flexible

One way to help achieve lean production systems is to employ flexible automated manufacturing equipment and automated material handling systems. A natural result of such a move is that fewer people a...

See Answer

Q: Describe how an ERP system fits into the overall information system structure

Describe how an ERP system fits into the overall information system structure in a firm.

See Answer