Q: Consider the two-component assembly shown in Figure 9-15
Consider the two-component assembly shown in Figure 9-15. Suppose that the specifications for the dimension X2 are 5 ±0.05 cm and those for X1 are 12± 0.15 cm. Find the spe...
See AnswerQ: Consider the two-component assembly shown in Figure 9-15
Consider the two-component assembly shown in Figure 9-15. Suppose that the mean lengths are given as μ1=14 cm and μ2=8 cm. Assuming that the specifications for Y are 6&Acir...
See AnswerQ: Four metal plates, each of thickness of 3 cm, are
Four metal plates, each of thickness of 3 cm, are welded together to form a subassembly. The specifications for the thickness of each plate are 3± 0.2 cm. Assuming the weld thickness to be negligible,...
See AnswerQ: Consider Figure 9-16, which shows the assembly of a
Consider Figure 9-16, which shows the assembly of a shaft in a bearing. The specifications for the shaft diameter are 6± 0.06 cm, and those for the hole diameter are 6.2± 0...
See AnswerQ: The specifications for a shaft diameter in an assembly are 5±
The specifications for a shaft diameter in an assembly are 5± 0.03 cm, and those for the hole are 5.25 ±0.08 cm. If the assembly is to have a clearance of 0.18 ±0.05 cm, what proportion of the assembl...
See AnswerQ: Refer to Exercise 9-30. If there is too much
Refer to Exercise 9-30. If there is too much clearance between the hole and the shaft, a wobble will result. Clearances above 0.05 cm are not desirable and cause a wobble. Find the probability of a wo...
See AnswerQ: In a piston assembly, the specifications for the piston diameter are
In a piston assembly, the specifications for the piston diameter are 12 ±0.5 cm, and those for the cylinder diameter are 12.10 ±0.4 cm. Assume that the natural tolerance limits coincide with the speci...
See AnswerQ: A logistics firm has identified four operations, which are to be
A logistics firm has identified four operations, which are to be conducted in succession, for an order to be processed. The tolerances (in hours) are shown in Table 9-9. Assume that the tolerances are...
See AnswerQ: A financial institution wants to improve proposal preparation time for its clients
A financial institution wants to improve proposal preparation time for its clients. Discuss the actions to be taken in reducing the average preparation time and the variability of preparation times.
See AnswerQ: Measurements on the pH values of a chemical compound are taken at
Measurements on the pH values of a chemical compound are taken at random by two operators. Fifteen samples are randomly chosen, with each operator measuring each sample twice. The data are shown in Ta...
See Answer