Garth Hudson was a 29-year-old graduate of Eastern State University (ESU) with a BS degree in management information systems. After graduation he worked for seven years at Bluegrass Systems in Louisville, Kentucky. While at ESU he worked part time for an oceanography professor, Ahmet Green, creating a customized database for a research project he was conducting. Green was recently appointed director of Eastern Oceanography Institute (EOI), and Garth was confident that this prior experience was instrumental in his getting the job as information services (IS) director at the institute. Although he took a significant pay cut, he jumped at the opportunity to return to his alma mater. His job at Bluegrass Systems had been very demanding. The long hours and extensive traveling had created tension in his marriage. He was looking forward to a normal job with reasonable hours. Besides, Jenna, his wife, would be busy pursuing her MBA at Eastern State University. While at Bluegrass, Garth worked on a wide range of IS projects. He was confident that he had the requisite technical expertise to excel at his new job. Eastern Oceanography Institute was an independently funded research facility aligned with Eastern State University. Approximately 50 full- and part-time staff worked at the institute. They worked on research grants funded by the National Science Foundation (NSF) and the United Nations (UN), as well as research financed by private industry. There were typically 7 to 9 major research projects under way at any one time, as well as 20 to 25 smaller projects. One-third of the institute’s scientists had part-time teaching assignments at ESU and used the institute to conduct their own basic research. FIRST YEAR AT EOI Garth made a point of introducing himself to the various groups of people upon his arrival at the institute. Still, his contact with the staff was limited. He spent most of his time becoming familiar with EOI’s information system, training his staff, responding to unexpected problems, and working on various projects. Garth suffered from food allergies and refrained from informal staff lunches at nearby restaurants. He stopped regularly attending the biweekly staff meetings in order to devote more time to his work. He only attended the meetings when there was a specific agenda item regarding his operation. The IS staff at EOI consisted of two full-time assistants, Tom Jackson and Grant Hill. They were supported by five part-time student assistants from the Computer Science Department. Grant Hill was assigned full-time to a large five-year NSF grant aimed at creating a virtual library of oceanographic research. Grant worked out of the project leader’s office and had very little interaction with Garth or Tom. Garth’s relationship with Tom was awkward from the start. He found out, after the fact, that Tom thought he would get the job as director. They never talked about it, but he sensed tension the first couple of months on the job. One of the problems was that he and Tom were totally different personalities. Tom was gregarious and very talkative. He had a habit of walking around the institute after lunch, talking to different scientists and researchers. Often this led to useful information. Garth, on the other hand, preferred to stay in his office, working on various assignments, and ventured out only when called upon. While Garth felt Tom was not on top of the latest developments, as he was, he respected Tom’s work. Last month the system was corrupted by a virus introduced over the Internet. Garth devoted an entire weekend to restoring the system to operation. A recurring headache was one of the servers, code-named “Poncho,” that would occasionally shut down for no apparent reason. Instead of replacing it, he decided to nurse Poncho along until it could be replaced. His work was frequently interrupted by frantic calls from staff researchers who needed immediate help on a variety of computer-related problems. He was shocked at how computer illiterate some of the researchers were and how he had to guide them through some of the basics of e-mail management and database configuration. He did find time to help Assistant Professor Amanda Johnson on a project. Amanda was the only researcher to respond to Garth’s e-mail announcing that the IS staff was available to help on projects. Garth created a virtual project office on the Internet so that Amanda could collaborate with colleagues from institutes in Italy and Thailand on a UN research grant. He looked forward to the day when he could spend more time on fun projects like that. THE BLUE SKY CONVERSION PROJECT The “Blue Sky” conversion project began in earnest four months ago. Ahmet Green returned from Washington, D.C., with grim news. The economic downturn was going to lead to a dramatic reduction in funding. He anticipated as much as a 25 percent reduction in annual budget over the next three to five years. This would lead to staff reductions and cutting of operating costs. One cost-cutting measure was moving IT operations to the “cloud.” Ahmet had first proposed the idea to Garth after attending a meeting with several directors of other institutes who faced similar financial challenges. The basic strategy was to move all of the institute’s databases, software, and even hardware to a “private cloud.” Staff would use their current PCs to simply access more powerful machines over the Internet. These powerful machines could be partitioned and configured differently according to the needs of research staff, giving each staff member his or her own virtual machine (VM). Staff could also access, use, and share virtual servers over the Internet as needed. Garth worked with the institute’s accountant on a cost/benefit analysis. From their standpoint it made perfect sense. First, the institute would not have to replace or upgrade aging computers and servers. Second, the institute would enjoy significant IT savings, since they would pay for only IT resources actually used. They would not have to make any major IT capital expenditures. Third, cloud computing would provide the scientists greater flexibility by accessing desired resources or software from anywhere at any time. And finally, once the system was up and running, the institute would no longer need the services of at least one full-time IT worker. Ahmet decided to name the project “Blue Sky” to put a positive spin on the conversion. At first the associate directors balked at the idea. Some had a hard time conceptualizing what cloud computing meant. Others were worried about security and reliability. In the end they reluctantly signed off on the project when given alternative cost-cutting initiatives. Garth assured them that cloud computing was the wave of the future and setting up or accessing virtual machines on the “cloud” was as simple as setting up or accessing their g- mail account. The conversion project would be completed in stages. The first stage was selecting a provider. The next stage was migrating non–mission critical information to the cloud. The next stages would entail migrating each of the six big grant projects in waves to the cloud. The final stage would focus on the remaining smaller projects. Training would be an integral part of each stage. The institute would maintain a back-up for all the data until six months after complete conversion. After that the cloud service provider would be responsible for backing up the data. At first Tom was excited about the project. He was savvy enough to realize that this was the future of computing and he was intrigued with how the whole system would work. His feelings soon changed when he started thinking about the potential ramifications for his job. He asked Garth more than once what the department would look like after the conversion. Garth replied vaguely that they would figure it out once the system was up and running. A task force was formed, headed by Garth, to select a cloud service provider. Garth was surprised by how many choices there were. Plans and cost structures varied considerably. After much deliberation the committee narrowed the choices to three. The first two were among the bigger providers in the industry, VMWARE and Microsoft. The third choice was a relatively new company, OpenRange, which offered a cheaper solution. Tom argued that even though the bigger providers would cost more, they were a much safer bet. Garth responded that he had confidence in OpenRange and cutting costs was the primary goal behind the project. In the end, Garth persuaded the committee to choose OpenRange. Not only would cost be significantly cheaper, but OpenRange would help in training the personnel. Garth liked this idea; training was not his strength, and he wasn’t looking forward to holding senior scientists’ hands through the process. It took Garth and Tom six weeks to identify noncritical data. Garth worked on the back end while Tom met with staff to identify noncritical information. The motto was when in doubt, leave it out. The actual migration only took a couple of days. Training proved to be more problematic. The staff sent by OpenRange appeared to be straight out of college. While enthusiastic, they were inexperienced in the art of getting older staff to accept and use new technology. Many trainers had the habit of simply doing things for the staff instead of showing them how to do it themselves. It all came to a head when a power outage at the OpenRange storage system shut down and disrupted operations at the institute for 36 hours. Ahmet held an emergency meeting. Garth reported that the power outage occurred in North East India and that OpenRange was expanding their back-up systems. Several members argued that the institute should switch to one of the bigger providers. When this came up Garth looked at Tom and was relieved when he remained silent. In the end, Ahmet announced that it would be too costly to switch providers and Garth and his staff would have to make the conversion work. Tom stepped forward and volunteered to manage the training. Everyone agreed that the institute should hire three more part-time assistants to help the staff with the transition. Garth worked behind the scenes, coordinating with his counterparts at OpenRange and planning the conversion of the next segment of the project. Tom worked closely with the OpenRange trainers and refocused their attention on teaching. Resistance was pretty high at first. Tom used his personal contacts within the institute to rally support for the change. He persuaded Garth to change the conversion schedule to begin with those projects in which the leads were most supportive of the change. Training improved and Tom created some useful training materials, including short videos on how to access the virtual machines. One problem that occurred early in the process involved a graduate research assistant who mistakenly hit the wrong commands and terminated her virtual machine instead of logging off. This resulted in complete loss of that machine’s data in the cloud. Fortunately, the institute had back-up and Tom was able to recover the work. Collaborating with some programmers at OpenRange, Tom wrote a program that triggered a pop-up message on the screen, warning users not to terminate their virtual machine when logging off. CLOSING OUT THE BLUE SKY PROJECT It took almost a year to complete the Blue Sky project. After the rocky beginning things went relatively smoothly. Acceptance was slow, but Tom and his staff worked with the staff to demonstrate how the new system would make their work easier. Two student assistants were always on call to address any problem or question. Garth spent most of his time interacting with the OpenRange counterparts and rarely ventured out of his office. He had his student assistants collect information from staff so he could configure the new virtual machines to exactly match staff needs. He put in long hours so that customized databases would work in the new environment. This proved to be a very difficult task and he was quite pleased with his work. Twice OpenRange experienced momentary power shortages at their server facility, which disrupted work at the institute. Garth was happy to report that OpenRange was breaking ground on an alternative server system in Ukraine. When the institute conducted a retrospective (project review) on the Blue Sky project, some still questioned the choice of OpenRange as a cloud service provider but praised Tom’s work on helping the staff make the transition. Despite the criticism over the choice of OpenRange, Garth felt good about the project. The system was up and running and the staff was beginning to enjoy the flexibility it provided. Besides, the institute would achieve real savings from the new system. Soon after the retrospective, Garth was surprised when Ahmet walked into his office and closed the door. Ahmet began by thanking Garth for his work on the project. He then cleared his throat and said, “You know, Garth, one of the consequences of Blue Sky is reducing our IT staff. Grant Hill is needed for the data library project. So it comes down to you or Tom. Frankly, there is general agreement among the associate directors that Tom is essential to the institute. I know this might come as a surprise to you, and before I make a decision I want to give you a chance to change my mind.” If you were Garth, how would you respond to the director? What mistakes did Garth make? What are the lessons to be learned from this case?
> Why should a milestone be a concrete, specific, measurable event?
> Does partnering only work on construction projects?
> What best practices are evident in this snapshot?
> Has anyone used these strategies when dealing with foreigners? Or wish he or she had?
> Patti Smith looked up at the bright blue Carolina sky before she entered the offices of Horizon Consulting. It was Friday, which meant she needed to prepare for the weekly status report meeting. Horizon Consulting is a custom software development company
> What does this project say about the importance of taking a socio-technical approach to projects?
> What disadvantages of outsourcing were evident in the Boeing 787 project?
> How did Singer establish effective patterns of communication?
> How did Singer enhance trust on his project?
> Looking back on your experience working on low-priority projects, did any of these strategies work?
> In addition to acting as a cheerleader, what other important roles does Tom West suggest a project manager play?
> How easy do you think it is to identify people who respond to challenges?
> What similarities do you see between the Ford Diesel team and the Mac team at Apple and the Skunk Works at Lockheed?
> How important is a fun culture for innovation?
> Which of the eight characteristics associated with positive synergy were not evident in the 2004 team that lost in the Olympics in Athens?
> Bruce Palmer had worked for Moss and McAdams (M&M) for six years and was just promoted to account manager. His first assignment was to lead an audit of Johnsonville Trucks. He was quite pleased with the five accountants who had been assigned to his team,
> How does the nominal group technique prevent groupthink from occurring on a project?
> What do you think would have happened if the work had been completed in Japan instead of Australia?
> Which of the eight characteristics associated with positive synergy were evident in the case of the Redeem team?
> What aspects of the Arthur Andersen culture contributed to the scandal?
> It seems like every 5–10 years a scandal damages, if not brings down, a well- known business. Is this inevitable, given the competitive nature of business?
> What do you think would have happened to the crew of the Endurance if Shackleton had not led by example?
> How important is leading by example on a project?
> Can you think of other metaphors that would be appropriate?
> What aspects of being a project manager are not reflected in this metaphor?
> Why is a conductor of an orchestra an appropriate metaphor for a project manager?
> The purpose of this case is to give you experience in using a project priority system that ranks proposed projects by their contribution to the organization’s objectives and strategic plan. COMPANY PROFILE The company is the film divisi
> Have you ever used bets to motivate someone? How effective was it?
> Wui arrived in Mobile, Alabama, in the middle of summer, unprepared for humidity and heat. The first day he bought a lightweight, breathable business suit. He was helped by a salesgirl who smiled as she packed the coat and slacks into a box. Americans ar
> On December 26, 2004, an earthquake reaching 9.1 on the Richter scale triggered a series of devastating tsunamis off the coast of Indonesia. They spread throughout the Indian Ocean, killing large numbers of people and inundating coastal communities acros
> Michael Thomas shouted, “Sasha, Tor-Tor, we’ve got to go! Our driver is waiting for us.” Thomas’s two daughters were fighting over who would get the last orange for lunch that day. Victoria (“Tor-Tor”) prevailed as she grabbed the orange and ran out the
> Ken Buttrey scratched his head as he looked over an e-mail from John Barbata. Ken was the team lead on the Jasper Jones project. He and 13 other developers were charged with creating Jasper Jones (JJ), a new character to appear in the next edition of the
> Kendra Hua worked for six years as a software engineer in the IT Department at Point 2 Point (P2P), a large freight moving company. She liked her job and the people she worked with. While she did some maintenance work, she worked primarily on projects, u
> Olaf Gundersen, the CEO of Wireless Telecom Company, is in a quandary. Last year he accepted the Maximum Megahertz project suggested by six up-and-coming young R&D corporate stars. Although Olaf did not truly understand the technical importance of the pr
> You are a member of a project management practicum class. The major assignment for this class is to plan and implement a fund-raising project that will raise at least $1,500 and provide an opportunity to practice project management. You have joined a gro
> Scanner Project You have been serving as Electroscan’s project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to da
> Ventura Stadium Status Report Case You are an assistant to Percival Young, president of G&E Company. He has asked you to prepare a brief report on the status of the Ventura Stadium project. Ventura Stadium is a 47,000-seat professional baseball stadi
> Hector Gaming Company (HGC) is an educational gaming company specializing in young children’s educational games. HGC has just completed their fourth year of operation. This year was a banner year for HGC. The company received a large influx of capital fo
> Tree Trimming Project Wil Fence is a large timber and Christmas tree farmer who is attending a project management class in the spring, his off season. When the class topic came to earned value, he was perplexed. Isn’t he using EV? Each summer Wil hires c
> The purpose of this case is to provide you with an opportunity to practice negotiations. PROCEDURE STEP 1 The class is divided into four groups, each comprising the project management group for one of four projects at Goldrush Electronics. STEP 2 Read
> Chad Cromwell, head of university housing, gazed up at the tower at Buxton Hall and smiled as he walked toward the landmark building. Buxton Hall was built in 1927 as a residential complex for over 350 students at Pacifica State University. At the time,
> Sitting in her office, Karin Chung is reviewing the past four months of the large corporate accounting software installation project she has been managing. Everything seemed so well planned before the project started. Each company division had a task for
> Shell Case Fabricators (SCF) designs and builds shell casings that enclose electronic products such as calculators, cell phones, and modems. Typically the cases are plastic or plastic compounds. SCF has six different production lines that cover different
> Franklin Equipment, Ltd. (FEL), with headquarters and main fabrication facilities in Saint John, New Brunswick, was founded 75 years ago to fabricate custom-designed, large machines for construction businesses in the Maritime Provinces. Over the years it
> Tran was taking his dog, Callie, on her evening walk as the sun began to set over the coastal range. He looked forward to this time of the day. It was an opportunity to enjoy some peace and quiet. It was also a time to review events on the Ajax project a
> Amber Briggs looked nervously at her watch as she sat at the front of a large table in the cafeteria at Kerzner Office Equipment. It was now 10 minutes after 3:00 and only 10 of the 14 members had arrived for the first meeting of the Kerzner anniversary
> Cerberus is a successful producer of specialty chemicals. It operates nine large campus sites in the United States, with a number of different business units on each site. These business units operate independently, with direct reporting to corporate hea
> Tom Bray was mulling over today’s work schedule as he looked across the bay at the storm that was rolling in. It was the second official day of the Pegasus project and now the real work was about to begin. Pegasus was a two-month renovation project for A
> The purpose of this “case exercise” is to provide you with experience in using a project selection process that ranks proposed projects by their contribution to an organization’s mission and strategy.
> Several complications arose during the course of trying to meet the deadline of January 20 for the “Now” wedding rehearsal. Since Lauren was adamant on having the wedding on January 21 (as was Connor for obvious reasons), the implications of each of thes
> On December 31 of last year, Lauren burst into the family living room and announced that she and Connor (her college boyfriend) were going to be married. After recovering from the shock, her mother hugged her and asked, “When?” The following conversation
> Rassy and the team were concerned with the results of your analysis. They spent the afternoon brainstorming alternative ways for shortening the project duration. They rejected outsourcing activities because most of the work was developmental in nature an
> You are the assistant project manager to Rassy Brown, who is in charge of the Nightingale project. Nightingale was the code name given to the development of a handheld electronic medical reference guide. Nightingale would be designed for emergency medica
> Each year countries enter their sailing vessels in the nine-month Round the World Whitbread Sailboat Race. In recent years about 14 countries entered sailboats in the race. Each year’s sailboat entries represent the latest technologies
> This case is based on a project introduced in Chapter 6 (p. 209). You will need to use the project plan created in the Ventura Baseball Stadium case to complete this assignment. Ventura Baseball Stadium is a 47,000-seat professional baseball stadium. G&E
> Given the project network derived in Part A of the case from Chapter 7, Appendix 7.1, Beth also wants to be prepared to answer any questions concerning compressing the project duration. This question will almost always be entertained by the Accounting De
> On June 23, 2018, in Thailand, a group of 12 boys aged between 11 and 17 from the local football team, named the Wild Boars, and their 23-year-old assistant coach entered the Tham Luang cave. Tham Luang is a large cave complex in northern Thailand along
> We have great information systems for reporting, tracking, and controlling costs on design projects. Our planning of projects is better than any I have seen at other companies. Our scheduling seemed to serve us well when we were small and we had only a f
> Fatma settled down for lunch at the Yank Sing Chinese restaurant. She was early and took the time to catch up on her e-mail. Soon she would be joined by Jasper and Viktoria, two fellow 2014 grads from Virginia Tech in Blacksburg, Virginia. Jasper worked
> What kinds of projects is Agile PM best suited for and why?
> Describe the four phases of the traditional project life cycle. Which phase do you think would be the most difficult one to complete?
> What are some of the key environmental forces that have changed the way projects are managed? What has been the effect of these forces on the management of projects?
> Jack and Jill Smith have just retired and want to build a small, basic cabin in the Blue Mountains of Vermont. They have hired Daryl Hannah as the general contractor for the project. She has assembled a team of three workers to complete the project: Tom,
> Define a project. What are five characteristics that help differentiate projects from other functions carried out in the daily operations of the organization?
> How does a Kanban board work?
> Why should an organization be interested in knowing what level they are at in the project maturity model?
> How can outsourcing increase the quality of work performed?
> Trust can actually encourage disagreement and conflict among team members.” Explain why this would be the case.
> Which of the eight traits/skills associated with being an effective project manager is the most important? The least important? Why?
> Define a white elephant in project management. Provide a real-life example.
> What are the eight elements of a typical scope statement?
> The technical and sociocultural dimensions of project management are two sides of the same coin. Explain.
> The Munsters have been saving money in order to buy a house. They figure that, given current interest rates, they could afford a $400,000 home. Before looking at houses on the market they decide to explore the possibility of building a new home. The Muns
> Bill (senior VP of product development): Carlos [project manager], we have to talk. I am concerned about the way we manage project risk here at Futuronics. I just came from an international “Future Mote Devices” meeting at UC Berkeley. [Note: A mote is a
> Calculate the direct and total direct costs of labor for a project team member using the following data: Hourly rate: $50/hr Hours needed: 100 Overhead rate: 30%
> Calculate the direct cost of labor for a project team member using the following data: Hourly rate: $50/hr Hours needed: 120 Overhead rate: 40%
> Safety is a major concern when working on projects abroad. Select a country that you would consider dangerous to work in and look up the travel advisory provided for that country by the U.S. State Department (http://travel.state.gov/). How safe is it to
> Following are four mini-cases from practice. Break into small groups and (1) analyze the case and (2) provide five recommendations for the IT Department.
> Access agilealliance.org and review the subsections Agile 101 and Timeline. What do they have to say about how Agile evolved and gained acceptance in the project management community?
> Use a project you are currently working on to hold a Scrum meeting according to the steps outlined in Figure 15.5. Designate one member to act as the Scrum master and hold a standing meeting that lasts no longer than 15 minutes. Assess the value of such
> Break into small groups and identify at least two real-life examples of projects in which a. The scope and technology are well known. b. The scope is well known but the technology is less well known. c. The scope is not well known but the technology is k
> Interview a project manager who works for an organization that implements multiple projects. Ask the manager what kind of closure procedures are used to complete a project and whether lessons learned are used.
> Given the following project network, baseline, and status information, develop status reports for periods 1–4 and complete the project summary graph (or a similar one). Report the final SV, CV, CPI, and PCIB. Based on your data, what is
> Review the network of stakeholders on p. 358 (Figure 10.1). Choose five different stakeholders and provide examples of why a project manager would need to negotiate with that stakeholder.
> You are a member of the X State University (XSU) student body entertainment committee. Your committee has agreed to sponsor a spring concert. The motive behind this concert is to offer a safe alternative to Hasta Weekend. Hasta Weekend is a spring event
> Break into four groups and review the instructions for a “Get the most you can” exercise provided by your teacher. Complete the exercise. What was your initial strategy? Did it change? If so, why? What does this exercise tell you about our ability to col
> Enter “outsourcing” in an Internet search engine and browse different websites. Who appears to be interested in outsourcing? What are the advantages of outsourcing? What are the disadvantages? Does outsourcing mean the same thing to different people? Wha
> The following activities are based on a current or recently completed group project that you are (were) involved in. This project may be a student project, a work project, or an extracurricular project. a. How strong is the team identity on this project
> The following activities are based on a recently completed group project that you were involved in. This project may have been a student project, a work project, or an extracurricular project. a. Analyze the development of the team in terms of the five-s
> The following seven mini-case scenarios involve ethical dilemmas associated with project management. How would you respond to each situation and why?
> Identify an important relationship (co-worker, boss, friend) in which you are having trouble gaining cooperation. Assess this relationship in terms of the influence currency model. What kinds of influence currency have you been exchanging in this relatio
> You are the project manager responsible for the overall construction of a new international airport. Draw a dependency map identifying the major groups of people that are likely to affect the success of this project. Who do you think will be most coopera
> You are organizing a benefit concert in your hometown that will feature local heavy metal rock groups and guest speakers. Draw a dependency map identifying the major groups of people that are likely to affect the success of this project. Who do you thin
> Access the Project Management Institute website and review the standards contained in the PMI Member Ethical Standards section. How useful is the information for helping someone decide what behavior is appropriate and inappropriate?
> From the following information, compute the early, late, and slack times for each activity. Identify the critical path.
> Trans Systems is a small information systems consulting firm located in Meridian, Louisiana. Trans has just been hired to design and install a local area network (LAN) for the city of Meridian’s social welfare agency. You are the manager for the project,
> Do an Internet search for the Keirsey Temperament Sorter Questionnaire and find a site that appears to have a reputable self-assessment questionnaire. Respond to the questionnaire to identify your temperament type. Read supportive documents associated wi
> Use the following information to compress one time unit per move using the least-cost method. Assume the total indirect cost for the project is $2,000 and there is a savings of $100 per time unit reduced. Calculate the total direct, indirect, and project
> Use the following information contained below to compress one time unit per move using the least-cost method.* Reduce the schedule until you reach the crash point of the network. For each move identify what activity or activities were crashed and the adj
> Suppose instead of assigning Bjorn’s work to Thor, you have the opportunity to hire two new plumbers to perform Bjorn tasks (shortening them by 50 percent). What would the new project estimated completion date be? Show your work.