2.99 See Answer

Question: Kendra Hua worked for six years as


Kendra Hua worked for six years as a software engineer in the IT Department at Point 2 Point (P2P), a large freight moving company. She liked her job and the people she worked with. While she did some maintenance work, she worked primarily on projects, usually full time. Her work covered a wide range of projects, including system upgrades, inventory control, GPS tracking, billing, and customer databases. These projects were typically able to meet project requirements but were consistently late. Within the IT Department it was common practice for a betting pool to emerge regarding completion dates. The rule of thumb was to take the original schedule, multiply it by 1.5, and start guessing from then on.
Management decided to try to turn things around by changing the way P2P completed IT projects. Instead of the traditional waterfall approach in which all the requirements were defined up front, the IT Department was to start using Agile Project Management, and more specifically Scrum, to complete their projects.
Kendra had just been assigned to the Big Foot project, which involved developing a system for monitoring P2P’s carbon footprint. To prepare for this project, Kendra and her entire team of software engineers would attend a two-day Scrum workshop.
Everyone was given a book on Scrum to prepare for the workshop. At first Kendra was overwhelmed by terminology—Scrum master, sprints, product manager, sprint logs, and so forth. She questioned the rugby metaphor, since the only thing she knew about the sport was that one of her ex-boyfriends in college would come back to the dorm inebriated and bloodied after a match. And why was the project manager called a master? It seemed demeaning to her. Still, she had heard some good things about Scrum from a friend who was using it in another company. He claimed it gave programmers more freedom to do their work and to work at a faster pace. So she approached the two-day workshop with an open mind.
The workshop was facilitated by a trainer who was well versed in the world of software development. Participants included her other five team members as well as Prem Gupta, a veteran project manager who would now assume the role of Scrum master, and Isaac Smith, who would act as the product manager representing the interests of the customers. At first everyone gave Prem a hard time by bowing to him, pleading “master, master, master . . .” The facilitator quickly corrected them by saying he was not their master but, rather, master of the Scrum process. The facilitator went on to emphasize that they would work as a self- organizing team. Kendra wasn’t exactly sure what that meant, but she felt it had something to do with the team managing itself, not Prem.
The workshop covered all the basic Scrum tools, concepts, and roles. Everyone got to practice the process by completing a simulated project involving the creation of a new board game. Kendra liked the idea of the standing Scrum meeting, since most of her meetings at P2P took way too long. She also liked having the product manager, who was the ultimate decision maker on features and when work was completed. Everyone laughed at the “only one neck to wring” analogy that the facilitator used to describe this role. Overall she thought the process had promise and she was excited about trying it out on the Big Foot project. The Big Foot project was estimated to be completed after five sprints, with each sprint lasting four weeks.
THE FIRST SPRINT
The first sprint planning meeting went pretty much by the book. Isaac, the product owner, had done his homework and came to the meeting with a comprehensive list of features the software needed to provide. There was healthy discussion, and Isaac amended the list to include some features that the team felt was necessary. The afternoon session featured Isaac prioritizing the features in the product backlog with feedback from the team. The final segment was devoted to the team deciding among themselves which high-priority features they would commit to build within the four-week sprint. Prem did a good job of reminding the team that they were expected to build a fully functional feature. This tempered the team’s enthusiasm, and in the end a challenging but doable set of features was assigned to the sprint backlog for the first sprint.
The first couple of daily Scrum meetings were a bit awkward as members were careful not to step on each other’s toes. One of the first impediments identified was not having a shared understanding of how a self-organizing team worked. Prem kept emphasizing that it was up to the team to decide who does what and when. Then one morning it just suddenly clicked and members came forward claiming work they felt needed to be done. After that the daily Scrums took on a life of their own, interrupted only when a member had to do five push-ups for every minute late. The pace of work picked up, and there was a shared enthusiasm as tasks and ultimately functional features were completed in rapid fashion. Kendra worked side by side with the other software engineers to solve problems and share what they had learned. Occasionally Isaac was called into the project room to answer questions about specific features and be shown work in progress.
By the time of the first sprint review meeting, the team was able to demonstrate all but one of the designated features to Isaac and even three more that were not on the initial hit list. The team got some useful feedback not only from Isaac but also from a couple of the end users he brought with him. Eighty percent of the features were proclaimed done by Isaac, while the others needed only slight modifications. Everyone agreed that the next Sprint review would be even more successful.
The sprint retrospective meeting was refreshing, as members spoke candidly about both the good and the bad. Everyone agreed that the team needed to do a better job at documentation. Issues regarding fairness and spreading both the fun work and the tough work among the entire team were brought to the surface. Kendra was impressed by how everyone focused on what was best for the project, not just himself or herself.
THE SECOND SPRINT
The second sprint meeting went well. The features that needed rework after the first sprint review meeting were at the top of the backlog. Isaac made appropriate adjustments in priorities, and a couple of new features that were discovered during the sprint review meeting were added. The meeting convened with the team confident that they would be able to complete the work they had committed to.
Project work progressed quickly over the next week. Kendra felt pressure to accomplish what she had said she would at the daily Scrum. At the same time, she felt a tremendous amount of satisfaction reporting work done. The entire team seemed energized. Then one day everything came to a standstill over a sticky integration problem. The team struggled over the next three days, trying to solve the problem, until, at the next Scrum, Prem stepped forward, saying, “I think you should do this. . . .” He then proceeded to outline a specific method for solving the problem, even assigning specific tasks to each team member. During the next two days Prem went back and forth between team members, coordinating their work and solving problems. While there was some grumbling within the team, his solution worked, and Kendra was grateful to get back on track.
From then on, Prem took a more active role in daily Scrum meetings, often having the final say as to the work agenda for that day. The meetings took on a different tone as members waited for Prem to speak first. Isaac was absent from the project room during this time, as he was visiting sites that would be using the new software. Still, features were being completed and Kendra was happy with the progress. Then one day Isaac showed up at the morning Scrum meeting. He had just gotten back and had fresh information he wanted to introduce into the project. He had rewritten the product log and added several new high-priority features and eliminated a few of the features that the team had been working on. He wanted the team to shift their efforts and complete the new features by the end of the sprint.
The team was shocked because one of the principles they had been taught is that you don’t change course midway through a sprint. Prem did his best to explain this to Isaac, but he was insistent. He kept saying that these changes had to be made; otherwise, much of the sprint output would be a waste of time. He kept repeating that the team needed to be flexible. “After all, isn’t that what the Agile approach is all about?” The meeting came to an impasse until Prem came forward with a compromise. The team would agree to do the new work, but the sprint needed to be extended by two weeks. Everyone agreed and Kendra went back to work.
Up until the end of the second sprint, Prem continued to direct project work. When it came for the sprint review meeting, four of the five new features were completed as well as most of the original features. However, the feature demonstrations did not go well. Isaac and several of the end users that were present were critical of the user friendliness of several of the completed features. Kendra and other team members defended their work by saying, “Why didn’t you tell us you wanted it to perform that way?” Prem did his best to keep the meeting under control, but the team had little to say when an important feature simply did not work. In the end, only half of the features were accepted as being done.
Kendra walked out of the sprint review discouraged. Tomorrow morning was the sprint retrospective meeting. She had a lot on her mind but wasn’t sure what she should say or how to say it at the meeting.
How well is Scrum working?
What are the issues confronting the Big Foot project?
Assume you are Kendra. What would you want to say at the retrospective? How would you say it?
What improvements or changes need to be made?
PART B
Prem opened the retrospective by saying he had gotten a call from his boss and she was not happy with the progress. Prem said that he and the team were under the gun to get back on track. The list of things that went well during the second sprint was short, and when it came time to discuss improvements there was an awkward silence. Kendra spoke up and began by saying she had gone back and reviewed the Scrum book. She went on to say that she thought the whole idea behind Scrum was that the team was to work to solve their own problems and it wasn’t Prem’s role to play task master. A couple of other team members murmured agreement. Prem became defensive and said if he had not intervened it would have taken days for the team to solve the problem.
Another member said he thought it was a mistake allowing Isaac to change the sprint commitments. Prem agreed that in principle that was true but said sometimes you have to bend the rules to do what is right. He admonished the team by saying that they had to practice being more agile. The retrospective ended with few specific recommendations other than that in order to get back on track, Prem felt he would have to get even more involved in the execution of the project.
The subsequent sprint 3 planning meeting was more of a formality. Isaac updated the product backlog with revised priorities, and Prem signed off for the team as to what they would commit to. There was little interaction between the team and Isaac except seeking clarification on performance requirements for specific features.
The team met under Prem’s leadership for their daily Scrums. Sometimes the Scrums went beyond the normal 15 minutes as Prem reviewed progress and described in detail what needed to be done that day. Isaac showed up occasionally, changed priorities, reviewed work, and answered questions. Kendra worked hard on her assignments and often received praise from Prem for work well done.
One evening when the team got together for a few beers and sushi, one of the team members pulled out a spreadsheet and asked who wanted to make the first bet on when they thought the project would be done.
After several sprints, Isaac finally signed off on the last feature and declared the project completed. A collective “yahoo” sprang from the team. After the meeting Kendra went around collecting money from each of her teammates—she had predicted that the project would take 12 weeks longer than planned.
How would you assess P2P’s effort at introducing Scrum?
What challenges does an organization face when adopting an Agile approach like Scrum? What could P2P have done to enhance success?


> Why not use the waterfall method to develop new champions?

> Why is it useful to hold retrospectives at the end of weekly iterations?

> Can you think of a personal project that would have benefited from prototyping? How? Why?

> What are the advantages of rapid prototyping?

> What effect do you think 360-degree reviews have on the culture of an organization?

> Have you been the subject of a 360-degree review or participated in one? What was it like? How useful was it?

> How did the project management system evolve at Navy Federal Credit Union?

> Assume you are to command a similar mission. What are two things you would insist on, based on what you learned about Eagle Claw?

> What could the NBA have done differently to increase the likelihood of success?

> How did the culture of the NBA affect this project?

> Brandon was having an ale with his girlfriend, Sierra, when the subject of the Omega Theta Pi 5K-run project came up. Brandon has been chosen to chair the 5K-charity run for his fraternity. At the time, Brandon thought it would look good on his resume an

> What was Sally able to achieve by holding a wake for the canceled project?

> Why do organizations use the percent complete instead of the cheaper, easier pseudo-earned value percent approach?

> How did limiting work packages to one week help management identify problems sooner?

> What additional information would you like to have in order to assess performance on the project?

> Based on the information provided in Exhibit 13.2, how well is the Decommissioning project doing in terms of cost and schedule?

> Should milestones only be on the critical path?

> Why should a milestone be a concrete, specific, measurable event?

> Does partnering only work on construction projects?

> What best practices are evident in this snapshot?

> Has anyone used these strategies when dealing with foreigners? Or wish he or she had?

> Patti Smith looked up at the bright blue Carolina sky before she entered the offices of Horizon Consulting. It was Friday, which meant she needed to prepare for the weekly status report meeting. Horizon Consulting is a custom software development company

> What does this project say about the importance of taking a socio-technical approach to projects?

> What disadvantages of outsourcing were evident in the Boeing 787 project?

> How did Singer establish effective patterns of communication?

> How did Singer enhance trust on his project?

> Looking back on your experience working on low-priority projects, did any of these strategies work?

> In addition to acting as a cheerleader, what other important roles does Tom West suggest a project manager play?

> How easy do you think it is to identify people who respond to challenges?

> What similarities do you see between the Ford Diesel team and the Mac team at Apple and the Skunk Works at Lockheed?

> How important is a fun culture for innovation?

> Which of the eight characteristics associated with positive synergy were not evident in the 2004 team that lost in the Olympics in Athens?

> Bruce Palmer had worked for Moss and McAdams (M&M) for six years and was just promoted to account manager. His first assignment was to lead an audit of Johnsonville Trucks. He was quite pleased with the five accountants who had been assigned to his team,

> How does the nominal group technique prevent groupthink from occurring on a project?

> What do you think would have happened if the work had been completed in Japan instead of Australia?

> Which of the eight characteristics associated with positive synergy were evident in the case of the Redeem team?

> What aspects of the Arthur Andersen culture contributed to the scandal?

> It seems like every 5–10 years a scandal damages, if not brings down, a well- known business. Is this inevitable, given the competitive nature of business?

> What do you think would have happened to the crew of the Endurance if Shackleton had not led by example?

> How important is leading by example on a project?

> Can you think of other metaphors that would be appropriate?

> What aspects of being a project manager are not reflected in this metaphor?

> Why is a conductor of an orchestra an appropriate metaphor for a project manager?

> The purpose of this case is to give you experience in using a project priority system that ranks proposed projects by their contribution to the organization’s objectives and strategic plan. COMPANY PROFILE The company is the film divisi

> Have you ever used bets to motivate someone? How effective was it?

> Wui arrived in Mobile, Alabama, in the middle of summer, unprepared for humidity and heat. The first day he bought a lightweight, breathable business suit. He was helped by a salesgirl who smiled as she packed the coat and slacks into a box. Americans ar

> On December 26, 2004, an earthquake reaching 9.1 on the Richter scale triggered a series of devastating tsunamis off the coast of Indonesia. They spread throughout the Indian Ocean, killing large numbers of people and inundating coastal communities acros

> Michael Thomas shouted, “Sasha, Tor-Tor, we’ve got to go! Our driver is waiting for us.” Thomas’s two daughters were fighting over who would get the last orange for lunch that day. Victoria (“Tor-Tor”) prevailed as she grabbed the orange and ran out the

> Ken Buttrey scratched his head as he looked over an e-mail from John Barbata. Ken was the team lead on the Jasper Jones project. He and 13 other developers were charged with creating Jasper Jones (JJ), a new character to appear in the next edition of the

> Olaf Gundersen, the CEO of Wireless Telecom Company, is in a quandary. Last year he accepted the Maximum Megahertz project suggested by six up-and-coming young R&D corporate stars. Although Olaf did not truly understand the technical importance of the pr

> You are a member of a project management practicum class. The major assignment for this class is to plan and implement a fund-raising project that will raise at least $1,500 and provide an opportunity to practice project management. You have joined a gro

> Scanner Project You have been serving as Electroscan’s project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to da

> Ventura Stadium Status Report Case You are an assistant to Percival Young, president of G&E Company. He has asked you to prepare a brief report on the status of the Ventura Stadium project. Ventura Stadium is a 47,000-seat professional baseball stadi

> Hector Gaming Company (HGC) is an educational gaming company specializing in young children’s educational games. HGC has just completed their fourth year of operation. This year was a banner year for HGC. The company received a large influx of capital fo

> Tree Trimming Project Wil Fence is a large timber and Christmas tree farmer who is attending a project management class in the spring, his off season. When the class topic came to earned value, he was perplexed. Isn’t he using EV? Each summer Wil hires c

> The purpose of this case is to provide you with an opportunity to practice negotiations. PROCEDURE STEP 1 The class is divided into four groups, each comprising the project management group for one of four projects at Goldrush Electronics. STEP 2 Read

> Chad Cromwell, head of university housing, gazed up at the tower at Buxton Hall and smiled as he walked toward the landmark building. Buxton Hall was built in 1927 as a residential complex for over 350 students at Pacifica State University. At the time,

> Sitting in her office, Karin Chung is reviewing the past four months of the large corporate accounting software installation project she has been managing. Everything seemed so well planned before the project started. Each company division had a task for

> Shell Case Fabricators (SCF) designs and builds shell casings that enclose electronic products such as calculators, cell phones, and modems. Typically the cases are plastic or plastic compounds. SCF has six different production lines that cover different

> Franklin Equipment, Ltd. (FEL), with headquarters and main fabrication facilities in Saint John, New Brunswick, was founded 75 years ago to fabricate custom-designed, large machines for construction businesses in the Maritime Provinces. Over the years it

> Tran was taking his dog, Callie, on her evening walk as the sun began to set over the coastal range. He looked forward to this time of the day. It was an opportunity to enjoy some peace and quiet. It was also a time to review events on the Ajax project a

> Amber Briggs looked nervously at her watch as she sat at the front of a large table in the cafeteria at Kerzner Office Equipment. It was now 10 minutes after 3:00 and only 10 of the 14 members had arrived for the first meeting of the Kerzner anniversary

> Cerberus is a successful producer of specialty chemicals. It operates nine large campus sites in the United States, with a number of different business units on each site. These business units operate independently, with direct reporting to corporate hea

> Tom Bray was mulling over today’s work schedule as he looked across the bay at the storm that was rolling in. It was the second official day of the Pegasus project and now the real work was about to begin. Pegasus was a two-month renovation project for A

> The purpose of this “case exercise” is to provide you with experience in using a project selection process that ranks proposed projects by their contribution to an organization’s mission and strategy.

> Garth Hudson was a 29-year-old graduate of Eastern State University (ESU) with a BS degree in management information systems. After graduation he worked for seven years at Bluegrass Systems in Louisville, Kentucky. While at ESU he worked part time for an

> Several complications arose during the course of trying to meet the deadline of January 20 for the “Now” wedding rehearsal. Since Lauren was adamant on having the wedding on January 21 (as was Connor for obvious reasons), the implications of each of thes

> On December 31 of last year, Lauren burst into the family living room and announced that she and Connor (her college boyfriend) were going to be married. After recovering from the shock, her mother hugged her and asked, “When?” The following conversation

> Rassy and the team were concerned with the results of your analysis. They spent the afternoon brainstorming alternative ways for shortening the project duration. They rejected outsourcing activities because most of the work was developmental in nature an

> You are the assistant project manager to Rassy Brown, who is in charge of the Nightingale project. Nightingale was the code name given to the development of a handheld electronic medical reference guide. Nightingale would be designed for emergency medica

> Each year countries enter their sailing vessels in the nine-month Round the World Whitbread Sailboat Race. In recent years about 14 countries entered sailboats in the race. Each year’s sailboat entries represent the latest technologies

> This case is based on a project introduced in Chapter 6 (p. 209). You will need to use the project plan created in the Ventura Baseball Stadium case to complete this assignment. Ventura Baseball Stadium is a 47,000-seat professional baseball stadium. G&E

> Given the project network derived in Part A of the case from Chapter 7, Appendix 7.1, Beth also wants to be prepared to answer any questions concerning compressing the project duration. This question will almost always be entertained by the Accounting De

> On June 23, 2018, in Thailand, a group of 12 boys aged between 11 and 17 from the local football team, named the Wild Boars, and their 23-year-old assistant coach entered the Tham Luang cave. Tham Luang is a large cave complex in northern Thailand along

> We have great information systems for reporting, tracking, and controlling costs on design projects. Our planning of projects is better than any I have seen at other companies. Our scheduling seemed to serve us well when we were small and we had only a f

> Fatma settled down for lunch at the Yank Sing Chinese restaurant. She was early and took the time to catch up on her e-mail. Soon she would be joined by Jasper and Viktoria, two fellow 2014 grads from Virginia Tech in Blacksburg, Virginia. Jasper worked

> What kinds of projects is Agile PM best suited for and why?

> Describe the four phases of the traditional project life cycle. Which phase do you think would be the most difficult one to complete?

> What are some of the key environmental forces that have changed the way projects are managed? What has been the effect of these forces on the management of projects?

> Jack and Jill Smith have just retired and want to build a small, basic cabin in the Blue Mountains of Vermont. They have hired Daryl Hannah as the general contractor for the project. She has assembled a team of three workers to complete the project: Tom,

> Define a project. What are five characteristics that help differentiate projects from other functions carried out in the daily operations of the organization?

> How does a Kanban board work?

> Why should an organization be interested in knowing what level they are at in the project maturity model?

> How can outsourcing increase the quality of work performed?

> Trust can actually encourage disagreement and conflict among team members.” Explain why this would be the case.

> Which of the eight traits/skills associated with being an effective project manager is the most important? The least important? Why?

> Define a white elephant in project management. Provide a real-life example.

> What are the eight elements of a typical scope statement?

> The technical and sociocultural dimensions of project management are two sides of the same coin. Explain.

> The Munsters have been saving money in order to buy a house. They figure that, given current interest rates, they could afford a $400,000 home. Before looking at houses on the market they decide to explore the possibility of building a new home. The Muns

> Bill (senior VP of product development): Carlos [project manager], we have to talk. I am concerned about the way we manage project risk here at Futuronics. I just came from an international “Future Mote Devices” meeting at UC Berkeley. [Note: A mote is a

> Calculate the direct and total direct costs of labor for a project team member using the following data: Hourly rate: $50/hr Hours needed: 100 Overhead rate: 30%

> Calculate the direct cost of labor for a project team member using the following data: Hourly rate: $50/hr Hours needed: 120 Overhead rate: 40%

> Safety is a major concern when working on projects abroad. Select a country that you would consider dangerous to work in and look up the travel advisory provided for that country by the U.S. State Department (http://travel.state.gov/). How safe is it to

> Following are four mini-cases from practice. Break into small groups and (1) analyze the case and (2) provide five recommendations for the IT Department.

> Access agilealliance.org and review the subsections Agile 101 and Timeline. What do they have to say about how Agile evolved and gained acceptance in the project management community?

> Use a project you are currently working on to hold a Scrum meeting according to the steps outlined in Figure 15.5. Designate one member to act as the Scrum master and hold a standing meeting that lasts no longer than 15 minutes. Assess the value of such

> Break into small groups and identify at least two real-life examples of projects in which a. The scope and technology are well known. b. The scope is well known but the technology is less well known. c. The scope is not well known but the technology is k

> Interview a project manager who works for an organization that implements multiple projects. Ask the manager what kind of closure procedures are used to complete a project and whether lessons learned are used.

> Given the following project network, baseline, and status information, develop status reports for periods 1–4 and complete the project summary graph (or a similar one). Report the final SV, CV, CPI, and PCIB. Based on your data, what is

2.99